Capability

Strategic Underground Program, Virginia

The Strategic Underground Program is a data-driven initiative to improve system reliability and reduce storm-related outage minutes

Substation Optimization Program, North Carolina

Pike provides distribution system analysis, design, project management, and construction services in support of a Substation Optimization Program...

Solar Transmission Line & Substation, Louisiana

This Solar Substation required the construction of a new 115/34.5 kV solar substation and a Gen-Tie 115 kV span in Louisiana...

Joint-Use Permit Management Pilot Project, Multiple States

Pike Engineering provided permit management and QC services to a customer for all its incoming joint-use attachments...

Joint-Use, Multiple States

Pike Engineering has nearly 200 people assigned to a utility's joint-use projects and we are continually growing. We have also optimized...

Grid Investment Program, Georgia

Since the program began in 2020, Pike has served as the largest vendor supporting the utility on its Grid Investment Program, a long-term initiative...

GIS Substation, Arizona

GIS Substation is a critical infrastructure project supporting a ten-year transmission system plan to strengthen grid reliability and accommodate...

Garage EV Chargers, Florida

Pike installed 4- NB240 Chargers in a parking garage. This was a unique project, in that it was completed within a parking garage with tight...

Overhead Hardening & Storm Undergrounding Program, Florida

Pike supports an Overhead Hardening and Undergrounding Program, a multi-decade initiative focused on hardening feeders and undergrounding...

Fiber-To-The-Home, Rhode Island

A town in Rhode Island is an island-based community of approximately 1,900 households. Prior to this project, the only options for connectivity were...

Fiber EPC ACROSS, Florida

An EPC fiber plan reinforces the utility’s grid communications across five awarded Florida regions. Total scope includes civil design, permitting, civil construction...

EV Charging Station, Florida

Pike installed the first ABB 400 Chargers in the United States. This project included the installation of 2-EV charging foundations, which required...

Distribution Feeder Backbone Conversion, Texas

Power Contracting and Pike Engineering were awarded two pilot projects in a Texas Metropolitan area to convert the primary three-phase...

Data Center Substation and Transmission Support, Arizona

This greenfield substation was primarily developed to serve a new 225 MW data center load, while also functioning as a critical intermediate connection point along the overall 230 kV Transmission Line.

230 kV Overhead Transmission Line, Florida

Pike recently constructed a new 230kV line between two critical substations. The first 23-mile line was challenging due to the urban and commercial...

Substation – 230 kV Greenfield Civil Construction, North Carolina

Burford's Construction successfully executed the civil construction scope for a new greenfield 230 kV substation in North Carolina.

138 kV Ring Bus Substation, Texas

Pike completed the construction of a 138 kV greenfield ring bus substation at a manufacturing facility in Texas. The substation included 2-breakers and 4-transformers...

Split 138 kV/345 kV Barehand Transmission Line Rebuild, Texas

Pike is completing 17.5 miles of 345kV barehand rebuild that includes installing 102 structures through rugged Texas Hill Country...

100MW /200 MWH – LFP Battery, Texas

The project was a 1 Pike effort, consisting of Pike Engineering, Pike Electric, Pike Renewables, and Pike Telecom. Full EPC scope of a substation and transmission connected facility.

100 MW/200 MWH – LFP Battery, Texas

This battery project was a 1 Pike effort, including Pike Engineering, Pike Electric, Pike Renewables, and Pike Telecom. Full EPC scope of a substation and transmission connected facility.

74 .9 MW Solar PV Transmission Interconnection, Florida

This generating facility interconnects via a new breakered terminal at the Switching Station. The point of interconnection is the first transmission line...

74.9 MW Solar PV Station, Florida

Pike recently built a Solar PV station capable of 74.9 MW net output located in Florida. This generating facility is interconnected to...

60 MW/120 MWH – LFP Battery, Texas

This project was a 1 Pike effort, including Pike Engineering, Pike Electric, Pike Renewables, and Pike Telecom. Full EPC scope of a substation and transmission connected facility.

115kV Transmission Line Civil Construction, Texas

Burford’s Construction successfully completed a 115kV Transmission Line project. Working in close coordination with Pike Electric line crews, the Burford’s team...