Building a Critical 47-Mile 230 kV Transmission Line Through Urban Florida
Tasks also included surveying, subsurface investigation, land clearing, grading, drainage, switching station pad preparation, fencing, access aprons, installation of foundations, steel structures, bus, hardware, conductor, OHGW, control cables, relays, grounding, equipment installation, testing, and commissioning.
A critical two-phase, 47-mile 230 kV transmission line between substations
Enhanced transmission capacity and reliability in a high growth corridor