A Greenfield 69 kV Substation Serving a 225 MW Data Center Load for APS
Improves grid reliability and redundancy to support high load growth in the region.
Coordinated with a major contracting firm for connection points between the substation and data center.
The current phase is the 69 kV yard, with future 230 kV yard in engineering design.