Strategic Underground Program, Virginia

Strategic Underground Program, Virginia Converting Virginia’s Most Vulnerable Overhead Lines toUnderground Since 2014 The Strategic Underground Program is a data-driven initiative to improve system reliability and reduce storm-related outage minutes by converting the most vulnerable overhead distribution lines to underground. Delivered under a turnkey contract model, the program is executed in partnership with Pike Electric […]

Substation Optimization Program, North Carolina

Substation Optimization Program North Carolina Turnkey EPC Substation Optimization Across the GreaterRaleigh Area Pike provides distribution system analysis, design, project management, and construction services in support of a Substation Optimization Program. The program focuses on hardening, resiliency, and advanced sectionalization at the substation level to ensure reliability and connectivity to the distribution system. Since 2022, […]

Joint-Use Permit Management Pilot Project, Multiple States

Joint-Use Permit Management Pilot Project Multiple States A Pilot Program With Industry-Changing Potential forJoint-Use Permit Management Pike Engineering provided permit management and QC services to a customer for all its incoming joint-use attachments. The pilot project has industry-changing potential in approaching this process, utilizing an outsourced model with Pike Engineering receiving permit requests directly from […]

Joint-Use, Multiple States

Joint-Use, Multiple States Scaling High-Volume Joint-Use Attachment DeliveryAcross Multiple Operating Companies Pike Engineering has nearly 200 people assigned to a utility’s joint-use projects and we are continually growing. We have also optimized the integration of the client’s software into our systems approach. Pike Engineering continues to lead delivery of the high-volume and high-demand joint-use attachments […]

Grid Investment Program, Georgia

Grid Investment Program Georgia Pike’s Largest-Vendor Role on a Georgia Utility’s Long-TermReliability Initiative Since the program began in 2020, Pike has served as the largest vendor supporting the utility on its Grid Investment Program, a long-term initiative focused on improving the reliability of their worst-performing distribution circuits. In support of the program, Pike performs a […]

Overhead Hardening & Storm Undergrounding Program, Florida

Overhead Hardening & Storm Undergrounding Program Florida A Multi-Decade Partnership Hardening Florida’sDistribution Grid Against Storms Pike supports an Overhead Hardening and Undergrounding Program, a multi-decade initiative focused on hardening feeders and undergrounding lateral lines and services statewide to improve reliability and upgrade infrastructure. The program has focused efforts on strengthening distribution feeders to withstand wind […]

Fiber-To-The-Home, Rhode Island

Fiber-To-The-Home Rhode Island Full Engineering for a Town-Owned Fiber-to-the-HomeNetwork in Rhode Island A town in Rhode Island is an island-based community of approximately 1,900 households. Prior to this project, the only options for connectivity were aging copper telephone infrastructure or satellite services. When the local electric utility upgraded its service connection to the island to […]

Fiber EPC ACROSS, Florida

Fiber EPC ACROSS Florida 1,000+ Route Miles of EPC Fiber Across Five Florida UtilityRegions An EPC fiber plan reinforces the utility’s grid communications across five awarded Florida regions. Total scope includes civil design, permitting, civil construction (underground and overhead), and fiber installation across a route exceeding 1,000 miles. Pike partnered with the utility’s network design […]

Distribution Feeder Backbone Conversion, Texas

Distribution Feeder Backbone Conversion Texas EPC Pilot Projects Converting Distribution FeederBackbones to Underground in Texas Power Contracting and Pike Engineering were awarded two pilot projects in a Texas metropolitan area to convert the primary three-phase distribution feeder backbone from overhead to underground. These pilot projects are part of a recently approved resiliency program with Power […]

230 kV Overhead Transmission Line, Florida

230 kV Overhead Transmission Line Florida Building a Critical 47-Mile 230 kV Transmission Line Through Urban Florida Pike recently constructed a new 230kV line between two critical substations. The first 23-mile line was challenging due to the urban and commercial areas where it was constructed and the several hundred easements to be worked. The second […]