Pike is completing 17.5 miles of 345kV barehand rebuild that includes installing 102 structures through rugged Texas Hill Country terrain, 39 of which include drilled shaft foundations. The project also involves extensive grading throughout the ROW. Pike has helped to develop a plan to safely execute this project within the project milestones. Pike is installing all 102 structures, pulling 17.5 miles of 1433 ACSS Merrimack conductor, and installing 17.5 miles of OPGW.
transmission-rebuild

RESULTS

  • Specialized construction planning and foundation design for Hill Country conditions and to minimize system disruption

  • Scope included right-of-way preparation and extensive grade and access work across a challenging topography