Pike installed the first ABB 400 Chargers in the United States. This project included the installation of 2-EV charging foundations, which required setting a pad for the new transformer, installing 4- EV charging signposts, as well as running and terminating circuits from the secondary side of the transformer to the ABB 400 chargers.