Civil Infrastructure

345 kV Substation & 138 kV Transmission With a Leading Renewable Energy Provider

Integrating renewable energy into the grid requires a unified approach to site preparation and technical construction. Pike delivered a single-bay 345 kV substation and 5+ miles of 138 kV transmission, integrating civil, clearing and specialized excavation to support large-scale wind energy infrastructure.

Related Projects

0

Strategic Underground Program, Virginia

The Strategic Underground Program is a data-driven initiative to improve system reliability and reduce storm-related outage minutes
img-substation

Substation Optimization Program, North Carolina

Pike provides distribution system analysis, design, project management, and construction services in support of a Substation Optimization Program…
0

Solar Transmission Line & Substation, Louisiana

This Solar Substation required the construction of a new 115/34.5 kV solar substation and a Gen-Tie 115 kV span in Louisiana…
1

Joint-Use Permit Management Pilot Project, Multiple States

Pike Engineering provided permit management and QC services to a customer for all its incoming joint-use attachments…
1

Joint-Use, Multiple States

Pike Engineering has nearly 200 people assigned to a utility’s joint-use projects and we are continually growing. We have also optimized…
1

Grid Investment Program, Georgia

Since the program began in 2020, Pike has served as the largest vendor supporting the utility on its Grid Investment Program, a long-term initiative…